Sunday, November 14, 2010

Timberland Outlet Chicago

finishing work Waldmannstrasse

18th July 2010

Four pictures documenting the progress in the Waldmannstrasse since the last visit. The road next to the tram line is completed, the tram trackbed itself is the situation the same as the last visit, because of the summery weather, the grass is not really up to.

at the stop Tscharnergut the surface work for the holding edge into town are completed. The other holding edge follows later, but on the Bethlehem side of the park in a safe distance to the car traffic on the street, Waldmann. For the pedestrian crossings have been built which are increases in road and in the area of the green tram route running paved.

0 comments:

Post a Comment