Thursday, September 23, 2010

Denise Milani Showing Nipples

documentation of the work between Juli and September 2010

In recent days I have some reports of 5 Completed in July and brought up, they are here below the two reports on the test drives on 1 September.
further reports will have to follow before, some still photos are processed, it will be so in the near future always new photos in Picasa Web Albums added, followed by the reports here later.

Update: Photos are now completely been uploaded to Picasa Web Album.

Wednesday, September 1, 2010

Simi Garewal Clips In Mera Naam Joker

Second tram on test drive test drive to Brno


The second tram, the tram-Vevey has dared to Be 4 / 8 754 to Brno. On the way back towards the city could be held in Ausserholligen.
The tram was significant faster than the first in the tour and was not accompanied by a large escort.

Piano Chords For Folding Stars



On 1 September 2010 was a trial run held in Brno. As this has occurred at a walking pace, I can shoot hundreds of images. Until all these are processed and made into a post, it will probably take several weeks, so here are already some photos in an unusual Illustration shown. The first shows the tram between Loryplatz and Castle mat.


The Public Combino 666, is located on the bridge over the BLS line Bern - Black Castle / Belp shortly before Ausserholligen.


The first tram climbs the slope to the bridge Bethlehem.


along the trackbed own in the area of Bethlehem Parks a railing was installed, Combino 666 runs here but by slowly.


Get In the field turning loop was run in both directions, so this photo is no additional funding. When reversing and the maximum speed this morning was extended.


At all stops (and even before hybrids) have a (long) pause is inserted, so that the rest of the traffic was able to overtake the slow tram. In Gäbelbach took this stop even a little longer because of the photographers and photographers.


in the best light shows at the bus stop Combino Ramuzstrasse, the last stop before the terminus.


In the turn loop Brünnen ride both tracks. After the outdoor track has already been traveled, the Combino went backwards again before the West Side. After some time the switch was finally made, the tram operates here in the inner track of a turning loop.