Friday, November 26, 2010

Cabelas Alaskan Guide Binoculars

Tram Second to test drive

first September 2010

That same day there was a second test drive to Brno. Unlike the first trip was made in this relatively brisk pace. The Bauhaus advertising Tram Be 4 / 8

Flour Substitute, Psyllium Husk

First test drive after Brünnen

first September 2010

On September it was finally time: The first test ride on the new tram line to Brno West Side Station took place! Some pictures here were already presented timely, now a review will follow the usual structure. The Tram (Combino Be 6 / 10 666) was (obviously) in the Brunnmatt on this route of Tram Bern West. (Photos: Stop Loryplatz left and in the Castle Road between Loryplatz and lock Matt right.)

drove the tram each several vehicles (Civil Engineering Department, Bern Mobil) on one side to make way for the the pace moving tram to get off to control the other, the position of the contact line. Left the tram at the entrance to the station Steigerhubel be seen right on the bridge over the railway lines Bern - Belp / Black Castle.

The left picture captures the historic moment: the first time a tram operates from its own resources to Bümplizer ground. Right after that it can take the tram down to the ramp Freiburgstrasse through. Throughout the trip, the tram is accompanied by numerous people, two employees of Bernmobil run ahead of the tram, some onlookers to stay with the event and shoot some of their personal memories.

over the most spectacular structure that was built for the tramway, completing the first test drive of Bethlehem. After the bridge you will walk through Bethlehem Bethlehem road next to Bethlehem Church. Shortly after the Murtenstrasse the image on the right is created with the first tram on its own trackbed.

The turning loop in bringing farm was inaugurated the same, the left image shows the reverse (!) Through the loop moving tram. Law, the tram is the last stop almost achieved in the Ramuzstrasse created (thanks to a favorable light), numerous press the test drive.

reached goal! Before the West Side, Combino shows 666 in the sun before the West Side. It will take still some test rides and instruction to the streetcar line 8, put into service, an important step is done.

Dollar Offset Method Simplified

track construction Bachmätteli

6th August 2010

At the beginning of August have moved the last tracks for Tram Bern West. The relatively short section in Bachmätteli was the culmination of about three years of construction activity.

On 6 August, finished the track work being complete, the concrete seems to be very fresh. In the foreground is the way the Holding edge of town to see.

The curve of the Bottigenstrasse stop Bachmätteli displays the image on the left.

Here, the tram would be inflected from the right, if we had chosen the last stop clover field (instead of the previous bus stop Rehage). Although such lines of the densely populated neighborhood Kleefeld would have developed better products would become worse due to the opening up of the neighborhood between the Bottigenstrasse and Winterhäli.

middle of the concrete area does not extend to a future pedestrian island.

located right in the foreground it, then, the last rail of the Tram Bern West. Thus, the Bern tram network is 2010 words a day and record length. Of course, especially here in Bachmätteli still a lot done before the opening, especially in road construction.

Saturday, November 20, 2010

When Will Gmc Change The Yukon Body

2nd place in the context Challenge

Good morning, dear Blog Friends,

yesterday, after logging in to the DO, I could not believe my eyes, I was in the frame Challenge for October 2nd Space gained with the own frame:



The template was also a highly expressive, painted picture of our times-Queen Susan / Redisu in the oasis, which was very inspiring.

Schussel And I've actually missed it by one day the voting date ... tztztz. 30 beautiful frames have been given, I would like some one like Tut.

My Award:



Yes, these are so small pleasures of everyday life that make the worlds great chaos bearable. Thank you dear Oasis for people's votes (albeit secret ballot was).

now I wish you a super great weekend.

LG Doro

Thursday, November 18, 2010

Mount And Blade Create Mod

collage

Good evening, dear blog visitors,

today my stern teacher Drea photo released my photo collage in the PI Academy. Did
correct something, because I was too tired in the confused state is doing what.

But I say unto you, that's nice and relaxing evening for me was to create themselves as other people's imagination (sometimes macabre and questionable) purely passive pull in me.

re-learned a great thing with PI and great to use for greeting cards:



















Credits: * * Click on image

During this lesson, I am on a small, brilliant, free program against "plunging lines "on photos met. They are usually scanned the buildings which were photographed wrong. My middle photo is also in the original wrong.

Before:


After:
















This
Proggy "ShiftN" makes everything straight and very quick indeed.

Now even a lesson and then go again to the module-end work, I have to pick me right in my stock photos.
morning I was free, but a full private schedule.

But then ... Weekend and sunshine .... trallala

wish you well as much of an.
LG Doro

Tuesday, November 16, 2010

Incesti Italiani Blog

In Memoriam-memory of my mother


Dear Blog Friends,


life is not always a pleasure to know each of us.

Today is the 10th Death of my dear mother. But they would not want me to sink into sadness. She always exudes warmth and joy of life, although she never had it easy. And I am glad that I have not failed in their lifetime, say to her now and then and to show that I'm glad they have a mother. But as a counselor I had it today like to me. In the photo is our cat-Aristocat Peterle, who left us in 2005 after 13 years over the rainbow bridge.
Sincerely
Doro

Sunday, November 14, 2010

Crusing Spotson Long Island

Fahrleitungsbau Ausserholligen

31st July 2010

Although the intensive construction phase is completed in Ausserholligen, there is something new: the overhead lines. In the assembled Contact lines are only a short gap closing between the top of the tram ramp (left) and Castle Street.

come from this perspective, the contact lines at the entrance to the Freiburg road to even greater advantage.

Between the trees, the suspension of the driving lines on building facades and catenary is hardly discernible.

The stop Ausserholligen under the highway bridge is up to the first provisionally established ticket machines ready. The Overhead lines have been suspended here mostly on the highway bridge piers.

are Ausserholligen After the stop on a short section of new catenary, while were then reused in the masts of the old castle street turn Trolleybusfahrleitungen.

Removing Varnish From A Tub

construction track trough Bachmätteli

31st July 2010

went, especially in the western part of the last phase of construction work brisk,. The entire section of the track trough was lined with concrete and.

in the curve from the stop Bachmätteli be split up this route. The backing track stones must be distributed before the tracks can be laid.

The railway tracks in the bus stop area is the creation of the realized. Compared to the bus stop, the road then a slight angle across the square. The station will benefit from the transformation certainly attractive.

The view in the other direction, the western end of the stop.

Here to see the eastern end of the stop. As usual in Bümpliz, the tram in one direction being overtaken by cars here in the direction of town.

The new police station includes the last phase of construction on the already constructed road section in the Bern ...

... the track end is on the left.

Should You Bring Formula To Hospital

intensive construction Bachmätteli

18th July 2010

approaching the end of the work. With this report last phase of the Tram Bern West documented. In Bachmätteli Bümpliz in the intensive construction phase has begun. The old pavement and trees, stop, etc. were all removed, leveled the ground and provided for the installation of the track trough.

In space Bachmätteli now the last line work is completed, really amazing that there are some that have not been replaced after it was built here nearly three years, again and again. The concrete slabs, which here cross the site are of the concrete cover of the town creek.

Bachmätteli The Square, no place (the superstructure of the lion area has such an urban revitalization unfortunately impossible), the uneven terrain, before construction of the tram trough must be leveled here.

After the stop Bachmätteli turn the tram into the Bottigenstrasse because the site seems to be in the initial state.

Here once stood the house Bachmätteli stops. On the occasion of the tram construction will arise a new bus shelters, similar to the bus stop Get field.