approaching the end of the work. With this report last phase of the Tram Bern West documented. In Bachmätteli Bümpliz in the intensive construction phase has begun. The old pavement and trees, stop, etc. were all removed, leveled the ground and provided for the installation of the track trough.
In space Bachmätteli now the last line work is completed, really amazing that there are some that have not been replaced after it was built here nearly three years, again and again. The concrete slabs, which here cross the site are of the concrete cover of the town creek.
Bachmätteli The Square, no place (the superstructure of the lion area has such an urban revitalization unfortunately impossible), the uneven terrain, before construction of the tram trough must be leveled here.
After the stop Bachmätteli turn the tram into the Bottigenstrasse because the site seems to be in the initial state.