finishing works Bern Street East and post

18th July 2010

it has done since the last report from the eastern part of the street in Bern Bümpliz some, although there have long intensive construction phase is over. The following pictures document the work so since 22 May, shortly after the end of an intensive construction phase.

The stop height was equipped ready, the next stop infrastructure, the road markings and pavement surfaces in the final state.

Further west are the finished pavement, including the new parking lots to see. The Bernstrasse replaced thanks to the shift of the stop height here a half-Allee character with trees on the northern side of the road.

The stop post is almost in the final state, trees, road markings etc. are missing at present, but can not be too long in coming.

The gyro in the mail is now in the completion phase. As a practical single component of the new tram lines, the tram is in the roundabout to concrete trackbed to the level of the road surface. This facilitates on the one hand to the other Road users in the assessment, where the tram goes by, and on the other hand, should keep the pad longer, which is particularly happy cyclists. Finally, it looks good, at least by the author. So no cars go straight over the roundabout, here are some curved concrete walls were built. In this regard, so the solution is not uniform: here, walls, posts elsewhere.

In Lue Of Gifts Make A Donation Wording

finishing work Ausserholligen

18th Ausserholligen July 2010

The station station was out of town with a stop house and a Smart Info (shows the next departure on) provided. Right to stop Ausserholligen in all its width can be seen in bus stops and road sector, the work completed, only the sidewalks need to be partially paved.

Later in the west to present the familiar picture. The road is already traveled, but traffic control is lacking for the branching vessels on the tram dock. These will be mounted later.

What Kind Of Education Did George Crum Have?

finishing works Bethlehem Church

18th July 2010

A short update here also follows the completion of work at the Bethlehem Church. The bollard in the Murtenstrasse (for the 27mm-Bus) is set up and prevents passage of private vehicles between the Waldmannstrasse and the Bethlehem Church. Otherwise, the works seem to be largely completed.